Air Conditioner, Load Camera, Tilt Cab, Anti Two-Block, Liccon Load Moment Indicator, 1578 hrs Crane Operation, 37 ft Minimum 171 ft Maximum Boom Length, 700 kg 100 ton Capacity Liebherr 5 Sheave Hook Block, 103600 lb Counterweight, Counterweight Removal System, Track Shoes