-
92' Four Section Main Boom
-
Two Piece 46' Swingaway Jib
-
2-Speed Planetary Hoist
-
300' 9/16" Regular Rope
-
5 Ton Hook and Ball
-
Single Sheave Quick Reeve 15 Ton Hook Block
-
70 Gallon Reservoir
-
3 Sheave Boom Head
-
Pedestal, Turret, Rotation Bearing & Swing System
-
Radio Anti-Two Block with Lockout
-
Load Moment Indicator with Anit Two Block Safety Device
-
Dual Operator Control Stations
-
System Pressure Gauge
-
Audible Outrigger/Stabilizer Motion Alarm
-
Out and Down Front Outriggers with Intermediate Spreads
-
Out and Down Rear Stabilizers
-
Two 60" Aluminum Toolbox
-
Slider Rail with 5 Winch Straps
-
Pintle Plate, Pintle, Air and Electrical
Mounted on a 2012 Freightliner M2106V
-
Cummins ISC-350, 350 HP
-
Easton Fuller RTO-1198LL Transmission
-
20,000 LBS Front Axle
-
40,000 LBS Rear Axkes with 46,000LBS Airliner
-
Driver Controlled Differential Lock
-
Air Conditioning
-
Approx 5,093 hours
-
Approx 95,043 Km’s