2002 Grove GMK7550
Re-hosed the entire upper engine works in 2020
New Transfercase and Second Dropbox in 2020
Passenger side Lift Cylinder re-packed in 2021
2016 the lower engine was completely replaced with a brand new engine.
New Main Line in 2015. New paint 2017.
A lot of upgrades.
Crane is configured with 7 axles, boom dolly prepped,aluminum wheels, 264,000 pounds ctw, No Mega-wing attachment, Full Luffing jib/fixed jib, and outrigger box removal.
|